Cost-plus building
Teluri does not sell a finished house. It manages the building of it.
In a cost-plus build, the cost of construction is yours and stays in plain view. Teluri plans, buys in your name and controls cost, schedule and technique, and is paid on what the build really costs.
Where every real of your build goes
You pay directly. The invoice is in your name.
Teluri brings at least three quotes. The choice is yours.
Teluri is paid a percentage of the real cost of the build.
The cycle of every fortnight
- 01
Quote
Teluri gathers at least three market quotes for every purchase.
- 02
Choose
You choose the supplier. The purchase and the invoice are in your name.
- 03
Measure
Every fifteen days, the work completed is totalled and presented to you.
- 04
Pay
Only then is Teluri paid, by the percentage agreed in the first meeting.
No price per square metre.
A square-metre price is a market average, and no average knows which finishes you chose. The investment comes from a survey of your own design.
Saving is a shared interest.
Every purchase is yours and every invoice is on record. Buying better matters to you and to Teluri at the same time.
-
Before the contract
01A conversation about your plot
We learn where the plot is, how far the design has come and where your family is in the decision. It works from any starting point: a plot with no design yet, a design in progress with your architect, or a finished design ready to build.
- You decide
- Whether the next step is to get to know Teluri's work.
- 02
Getting to know Teluri's work
In a meeting, you see the owner app working and get to know Teluri's builds. When it makes sense, a visit to an active site is arranged.
- You get
- Teluri's work as it really is, before any contract.
- You decide
- Whether we speak the same language.
- 03
A cost survey of your design
The investment comes from your design and your specifications, not from a per-square-metre average. This is the meeting where Teluri's percentage is presented.
- You get
- The projected cost of your build, worked out from your design.
- You decide
- Whether to move on to the contract.
-
Contract
04A contract with a schedule
The date only enters the contract after the cost survey. Before that, no promise on timing. The physical and financial schedule is drawn up here.
- You get
- The schedule that will later be posted on the site hoarding.
- You decide
- Whether to sign, with the cost and the date already known.
-
During the build
05A build with the control room open
Measurement every fortnight, purchases in your name, cameras and the app. Every stage gets its own photographic record, and every change is costed and presented before it goes ahead.
- You get
- Each fortnight's measurement and the invoice for every purchase.
- You decide
- The supplier for every purchase and every change. Nothing goes into the build without your signature.
-
On handover
06Handover with the Owner's Manual
Inspection, a handover checklist and the house with its history: soil study, concrete tests, photos of the pipes inside the walls, material specifications and warranties, and the maintenance schedule.
- You get
- The keys and the house's manual. For Casa Firenze it ran to 94 pages.
- You decide
- Whether your next build is with Teluri too.
During the build
What you follow, from wherever you are.
The build is run from an administrative base set up inside the site itself. You have access to what happens there.
-
The owner app
Every invoice, the physical and financial schedule, planned against actual, and the bills coming due, updated while the work goes on.
-
The cameras
Audio and video on every site, live. The site stays under your eye even on the days you cannot get there.
-
The site office
An air-conditioned space inside the site, with a dedicated professional on hand full time, ready to receive you, your architect and your suppliers.
-
The schedule on the hoarding
Posted at the front of the site and updated every period. Anyone passing by can see what stage the house is at.
-
Fortnightly measurement
Every fifteen days, the work completed is added up and presented to you before it is billed.
Before you hire
What people ask about hiring Teluri.
What is a cost-plus build?
It is the model in which the builder manages the work and the cost of construction belongs to the owner. At Teluri, purchases are made in your name, against at least three quotes presented to you, and Teluri is paid a percentage of the construction cost.
When do I find out Teluri's percentage?
At the first meeting, together with the cost survey of your design. The percentage depends on the size and complexity of the build, which is why it is not published.
Why don't you quote a price per square metre?
Because a square-metre price is a market average, and no average knows which finishes you chose. The investment in your build comes from a cost survey of your design, with your specifications.
Who chooses the suppliers?
You do. Every purchase comes with at least three market quotes, the choice is yours and the invoice carries your name. Every invoice is in the owner app.
When is the handover date set?
After the cost survey and the schedule, never before. The average duration in practice is 12 to 15 months, depending on the size and complexity of the design.
I already have an architect and a design. Where do I start?
With the conversation and a visit to a build. Teluri builds designs from any practice and works alongside your architect for the whole build.
The clearest way to understand it is to talk about your build.
In a meeting, we show how each stage would work on your project, from the cost survey to handover.
Book a meeting about your build