Trouble on site is not a consequence of building. It is the absence of method.

What Teluri controls on every build, without exception, and how you verify each of those controls while the work is happening.

The premise

Engineering is not here to impress. It is here to remove uncertainty.

The market has come to treat delay, unexpected cost, rework and emotional strain as the unavoidable price of building. Teluri starts from the opposite premise: none of that comes from construction. It comes from the absence of planning, governance and control.

From there, engineering stops being a purely technical discipline and becomes the instrument that protects three things of yours: your time, your money and your peace of mind.

Six controls hold that promise up. None of them is optional.

The six controls

What Teluri controls on every build.

01 Fidelity to the design
02 Financial predictability
03 A schedule that holds
04 An orderly site
05 Precision in the finish
06 Hospitality

01 · Fidelity to the design

Rebar set in the formwork before the pour, on a Teluri site

Fidelity to the design

The house comes out exactly as it was drawn. Architecture, structure and building services are coordinated on paper before the first concrete pour, not during it. Any change that comes up along the way is priced, presented and approved by you before it reaches the site: nothing is decided on site for you to discover later.

02 · Financial predictability

Technical drawings and organised documents on a desk

Financial predictability

A cost survey before work starts, measurement of completed work every fortnight, and planned against actual left open in the app at all times. Every purchase is made in the owner's name, against at least three market quotes presented to him. The supplier is your call and the invoice carries your name.

03 · A schedule that holds

Construction schedule posted on the site hoarding

A schedule that holds

The schedule enters the contract after the cost survey, never before. And it is posted on the site hoarding, updated period by period: anyone walking past can see which stage the house has reached. Putting the schedule on the façade means committing to the date in public, and that is the most direct commitment there is to a deadline.

04 · An orderly site

Aerial view of a Teluri build in progress

An orderly site

A clean site, protected materials, safe circulation and a trained crew. Inside the site there is an air-conditioned office with a full-time manager, ready to receive you, your architect and your suppliers. A disorderly site is a cost that has not shown up on the spreadsheet yet.

05 · Precision in the finish

Stone being set and checked with a spirit level on a Teluri site

Precision in the finish

Laser levelling throughout, plumb, square and setting checked stage by stage, and specific treatment at the points where cracks tend to appear years later. The detail your eye picks up ten years from now is settled on the day the piece is laid.

06 · Hospitality

The three Teluri partners together on site

Hospitality

You are received on site, you get an answer the same day, and you know who to speak to on each subject. Teluri works on a limited number of builds, and that is what lets the person who decides also be the person who answers.

On site

The method, explained inside the build.

Three short films shot on Teluri sites. They are in Portuguese, with subtitles burned in.

  • Running the build

    The schedule posted on the hoarding, costs forecast before work starts, an app and live cameras with sound for the owner, and an orderly site.

  • Finishes start in the shell

    Stairs cast with the stone thickness already allowed for, the eave recess for the plaster ceiling, and the slab step between bedroom and bathroom.

  • Before the plaster

    Laser levels on blockwork and screeds, a 25 mm render, mesh between courses, and conduits set in beforehand so the render does not crack.

The stages

How a build progresses, from foundation to handover.

Each stage has its own photographic record. That record is what later becomes a chapter of the Owner's Manual.

  1. Rebar set in the formwork before the pour, on a Teluri site

    01

    Foundation and reinforcement

    Documented soil survey. Footings, beams and reinforcement photographed before they are covered, while they can still be checked.

  2. Concrete wheeled across the site

    02

    Concrete pour

    A sample from every pour tested in a laboratory, with the result on file. Concrete strength is measured, not taken on the supplier's word.

  3. Electrical conduits set into the blockwork before plastering

    03

    Services and blockwork

    Electrical and plumbing runs photographed while the wall is still open. Once it is plastered and painted, that record is the only way to know what runs where.

  4. Stone being set and checked with a spirit level on a Teluri site

    04

    Cladding and stonework

    Setting checked piece by piece, with laser levelling and protection for material already installed.

  5. Finishing stage

    05

    Finishing

    A final check of level, plumb and square, room by room, before the house is called finished.

  6. Aerial view of a Teluri build in progress

    06

    Inspection and handover

    Aerial inspection, handover checklist, and the Owner's Manual in your hands with the full history of the build.

Technical rigour

What gets checked, measured and recorded.

None of this is brochure material. It is control that stays documented and reaches your hands at the end of the build.

Soil survey
Documented before the foundation begins.
Concrete test cylinders
A sample from every pour tested in a laboratory, with the result on file.
Laser levelling
Throughout the build, not only on the stages that stay visible.
Crack protection
Specific treatment at the points where cracks tend to appear years later.
Reinforcement and footing records
Photographed before the pour, while they can still be checked.
Pipework mapping
Electrical and plumbing runs photographed with the blockwork exposed, before plastering.
Three quotes per purchase
Presented to you. The supplier is your call.
Centralised electrical panel
LED drivers gathered behind a single point, so no plasterboard ever needs cutting.

The Owner's Manual

At the end of the build you receive the house and its history.

Every Teluri build ends with a manual handed to the owner. It is not a welcome brochure: it is the record of what was done, what was used, where everything sits and how to maintain it.

On Casa Firenze that manual reached 94 pages. The build being completed now should pass 120.

Alan Rodrigues, engineer in charge · 20 Aug 2026

Pages from the real manual of Casa Firenze. The text is kept out of focus: the document belongs to the owner's house.

  1. 01 / 13 · Cover

    Every house gets its own

    This one belongs to Casa Firenze: 94 pages about a single house.

  2. 02 / 13 · Contents, 1 of 3

    First, what falls to each side

    The owner's responsibilities, the warranty, the inspection and how to request technical support. Then foundations and structure.

  3. 03 / 13 · Contents, 2 of 3

    Every system with its own period

    Walls, plumbing, electrics and window frames. Each with its warranty period, maintenance care and what voids the warranty.

  4. 04 / 13 · Contents, 3 of 3

    21 chapters and 7 annexes

    Paint, floors, glazing, sanitaryware, garage and roof. In the annexes, the soil survey, the plumbing plans, the tests and the handover record.

  5. 05 / 13 · Warranty terms

    The warranty is in writing

    With the standard behind it (NBR 5674) and what falls to each side, before you ever need it.

  6. 06 / 13 · Soil survey layout

    The soil was studied before the foundations

    The plan shows where each survey borehole was drilled on the plot.

  7. 07 / 13 · Foundations

    What gets buried is photographed

    Reinforcement and footings checked before the concrete, with the date. Once it is poured, nobody sees it again.

  8. 08 / 13 · Blockwork

    What prevents cracks, on record

    Mesh between the courses and plaster prepared with a laser level, with a photo of every stage.

  9. 09 / 13 · Warranty periods

    How long each item is covered

    Pipes, sanitaryware, valves and water risers, each with its own period.

  10. 10 / 13 · Plumbing walls

    Where every pipe runs

    The plan of each room marks the area that must not be drilled. You know before you drill the wall.

  11. 11 / 13 · Concrete test

    The concrete tested in a laboratory

    Samples from the pours crushed in a press, with the result of every one.

  12. 12 / 13 · Gas test

    The gas line tested before you move in

    28 hours under pressure to confirm there is no leak at any point.

  13. 13 / 13 · Handover record

    The handover is signed too

    After the final inspection, you sign for the house. It is the last page.

Scroll to leaf through

  1. Page from the Casa Firenze Owner's Manual: Cover

    01 · Cover

    Every house gets its own

    This one belongs to Casa Firenze: 94 pages about a single house.

  2. Page from the Casa Firenze Owner's Manual: Contents, 1 of 3

    02 · Contents, 1 of 3

    First, what falls to each side

    The owner's responsibilities, the warranty, the inspection and how to request technical support. Then foundations and structure.

  3. Page from the Casa Firenze Owner's Manual: Contents, 2 of 3

    03 · Contents, 2 of 3

    Every system with its own period

    Walls, plumbing, electrics and window frames. Each with its warranty period, maintenance care and what voids the warranty.

  4. Page from the Casa Firenze Owner's Manual: Contents, 3 of 3

    04 · Contents, 3 of 3

    21 chapters and 7 annexes

    Paint, floors, glazing, sanitaryware, garage and roof. In the annexes, the soil survey, the plumbing plans, the tests and the handover record.

  5. Page from the Casa Firenze Owner's Manual: Warranty terms

    05 · Warranty terms

    The warranty is in writing

    With the standard behind it (NBR 5674) and what falls to each side, before you ever need it.

  6. Page from the Casa Firenze Owner's Manual: Soil survey layout

    06 · Soil survey layout

    The soil was studied before the foundations

    The plan shows where each survey borehole was drilled on the plot.

  7. Page from the Casa Firenze Owner's Manual: Foundations

    07 · Foundations

    What gets buried is photographed

    Reinforcement and footings checked before the concrete, with the date. Once it is poured, nobody sees it again.

  8. Page from the Casa Firenze Owner's Manual: Blockwork

    08 · Blockwork

    What prevents cracks, on record

    Mesh between the courses and plaster prepared with a laser level, with a photo of every stage.

  9. Page from the Casa Firenze Owner's Manual: Warranty periods

    09 · Warranty periods

    How long each item is covered

    Pipes, sanitaryware, valves and water risers, each with its own period.

  10. Page from the Casa Firenze Owner's Manual: Plumbing walls

    10 · Plumbing walls

    Where every pipe runs

    The plan of each room marks the area that must not be drilled. You know before you drill the wall.

  11. Page from the Casa Firenze Owner's Manual: Concrete test

    11 · Concrete test

    The concrete tested in a laboratory

    Samples from the pours crushed in a press, with the result of every one.

  12. Page from the Casa Firenze Owner's Manual: Gas test

    12 · Gas test

    The gas line tested before you move in

    28 hours under pressure to confirm there is no leak at any point.

  13. Page from the Casa Firenze Owner's Manual: Handover record

    13 · Handover record

    The handover is signed too

    After the final inspection, you sign for the house. It is the last page.

The three Teluri partners on the terrace of a build in progress

A method is easier to believe once you have seen it.

In the meeting, we show in practice how each control would work on your build.

Book a meeting about your build